Now liveThe Skillselion MCP - thousands of ranked skills, loaded into your agent mid-task. No install.Get it →
bmad-code-org avatar

Wds 0 Project Setup

  • 1 installs
  • 85 repo stars
  • Updated May 30, 2026
  • bmad-code-org/bmad-method-wds-expansion

wds-0-project-setup is a Claude Code skill that onboards a BMAD WDS project by determining its type, complexity, and tech stack and routing it to the correct phase.

About

This skill is the entry point for a BMAD WDS project. It determines whether the project is new (greenfield) or existing (brownfield), captures complexity and tech stack, then routes to the correct downstream phase. It creates the folder structure and a project outline before design work starts.

  • Onboards a WDS project: determines type, complexity, and tech stack
  • Routes greenfield projects to Phase 1 and brownfield to Phase 8
  • Creates the folder structure and a project outline in 3-5 minutes

Wds 0 Project Setup by the numbers

  • 1 all-time installs (skills.sh)
  • Ranked #2,476 of 3,282 Productivity & Planning skills by installs in the Skillselion catalog
  • Data as of Aug 4, 2026 (Skillselion catalog sync)
At a glance

wds-0-project-setup capabilities & compatibility

Capabilities
project setup · project onboarding · workflow routing
Use cases
planning · project management
From the docs

What wds-0-project-setup says it does

Project onboarding - determine project type, complexity, tech stack, and route to correct phase
SKILL.md
**The #1 mistake**: Starting Phase 1 with an existing codebase.
SKILL.md
**Phase 0 takes 3-5 minutes. It saves hours of wrong-path work.**
SKILL.md
npx skills add https://github.com/bmad-code-org/bmad-method-wds-expansion --skill wds-0-project-setup

Add your badge

Show developers this skill is listed on Skillselion. Paste this into your README.

Listed on Skillselion
Installs1
repo stars85
Last updatedMay 30, 2026
Repositorybmad-code-org/bmad-method-wds-expansion

What it does

Onboard a new WDS project by determining its type, complexity, and tech stack, then routing to the correct phase.

Who is it for?

Anyone starting or joining a WDS project who needs to pick the right workflow

Skip if: Established WDS projects that already have a project outline

When should I use this skill?

starting a new WDS project, using WDS for the first time, or unsure which workflow you need

What you get

A configured project with folder structure and outline, routed to the correct phase.

  • Project folder structure
  • Project outline

By the numbers

  • 2 setup steps: Welcome and Configuration
  • Phase 0 takes 3-5 minutes

Files

SKILL.mdMarkdownGitHub ↗

Follow the instructions in ./workflow.md.

Related skills

FAQ

What does Phase 0 project setup do?

It determines project type, complexity, and tech stack, creates the folder structure, and routes greenfield projects to Phase 1 and brownfield to Phase 8.

How long does it take?

Phase 0 takes 3-5 minutes and is meant to save hours of wrong-path work.

This week in AI coding

Five minutes, every Monday - the tools, releases and tactics for developers.

unsubscribe anytime.