Now liveThe Skillselion MCP - thousands of ranked skills, loaded into your agent mid-task. No install.Get it →
donchitos avatar

Estimate

  • 255 installs
  • 23.6k repo stars
  • Updated May 21, 2026
  • donchitos/claude-code-game-studios

For development and infrastructure management.

About

estimate is an AI coding tool that enhances development workflows. Builders use it for infrastructure, integration, and platform development within the catalog ecosystem.

  • estimate
  • Development

Estimate by the numbers

  • 255 all-time installs (skills.sh)
  • Ranked #1,494 of 4,347 Backend & APIs skills by installs in the Skillselion catalog
  • Data as of Aug 5, 2026 (Skillselion catalog sync)
npx skills add https://github.com/donchitos/claude-code-game-studios --skill estimate

Add your badge

Show developers this skill is listed on Skillselion. Paste this into your README.

Listed on Skillselion
Installs255
repo stars23.6k
Last updatedMay 21, 2026
Repositorydonchitos/claude-code-game-studios

What it does

For development and infrastructure management.

Files

SKILL.mdMarkdownGitHub ↗

Phase 1: Understand the Task

Read the task description from the argument. If the description is too vague to estimate meaningfully, ask for clarification before proceeding.

Read CLAUDE.md for project context: tech stack, coding standards, architectural patterns, and any estimation guidelines.

Read relevant design documents from design/gdd/ if the task relates to a documented feature or system.

---

Phase 2: Scan Affected Code

Identify files and modules that would need to change:

  • Assess complexity (size, dependency count, cyclomatic complexity)
  • Identify integration points with other systems
  • Check for existing test coverage in the affected areas
  • Read past sprint data from production/sprints/ for similar completed tasks and historical velocity

---

Phase 3: Analyze Complexity Factors

Code Complexity:

  • Lines of code in affected files
  • Number of dependencies and coupling level
  • Whether this touches core/engine code vs leaf/feature code
  • Whether existing patterns can be followed or new patterns are needed

Scope:

  • Number of systems touched
  • New code vs modification of existing code
  • Amount of new test coverage required
  • Data migration or configuration changes needed

Risk:

  • New technology or unfamiliar libraries
  • Unclear or ambiguous requirements
  • Dependencies on unfinished work
  • Cross-system integration complexity
  • Performance sensitivity

---

Phase 4: Generate the Estimate

## Task Estimate: [Task Name]
Generated: [Date]

### Task Description
[Restate the task clearly in 1-2 sentences]

### Complexity Assessment

| Factor | Assessment | Notes |
|--------|-----------|-------|
| Systems affected | [List] | [Core, gameplay, UI, etc.] |
| Files likely modified | [Count] | [Key files listed below] |
| New code vs modification | [Ratio] | |
| Integration points | [Count] | [Which systems interact] |
| Test coverage needed | [Low / Medium / High] | |
| Existing patterns available | [Yes / Partial / No] | |

**Key files likely affected:**
- `[path/to/file1]` -- [what changes here]

### Effort Estimate

| Scenario | Days | Assumption |
|----------|------|------------|
| Optimistic | [X] | Everything goes right, no surprises |
| Expected | [Y] | Normal pace, minor issues, one round of review |
| Pessimistic | [Z] | Significant unknowns surface, blocked for a day |

**Recommended budget: [Y days]**

### Confidence: [High / Medium / Low]

[Explain which factors drive the confidence level for this specific task.]

### Risk Factors

| Risk | Likelihood | Impact | Mitigation |
|------|-----------|--------|------------|

### Dependencies

| Dependency | Status | Impact if Delayed |
|-----------|--------|-------------------|

### Suggested Breakdown

| # | Sub-task | Estimate | Notes |
|---|----------|----------|-------|
| 1 | [Research / spike] | [X days] | |
| 2 | [Core implementation] | [X days] | |
| 3 | [Testing and validation] | [X days] | |
| | **Total** | **[Y days]** | |

### Notes and Assumptions
- [Key assumption that affects the estimate]
- [Any caveats about scope boundaries]

Output the estimate with a brief summary: recommended budget, confidence level, and the single biggest risk factor.

This skill is read-only — no files are written. Verdict: COMPLETE — estimate generated.

---

Phase 5: Next Steps

  • If confidence is Low: recommend a time-boxed spike (/prototype) before committing.
  • If the task is > 10 days: recommend breaking it into smaller stories via /create-stories.
  • To schedule the task: run /sprint-plan update to add it to the next sprint.

Guidelines

  • Always give a range (optimistic / expected / pessimistic), never a single number
  • The recommended budget should be the expected estimate, not the optimistic one
  • Round to half-day increments — estimating in hours implies false precision for tasks longer than a day
  • Do not pad estimates silently — call out risk explicitly so the team can decide

Related skills

This week in AI coding

Five minutes, every Monday - the tools, releases and tactics for developers.

unsubscribe anytime.