
Story
- 13 installs
- 7 repo stars
- Updated June 18, 2026
- duc01226/easyplatform
Creates user stories from PBIs, slices features, and breaks down requirements.
About
Generates user stories from product backlog items and slices features into smaller pieces. A developer or PM runs it to break requirements into implementable stories.
- User stories from PBIs
- Feature slicing and breakdown
Story by the numbers
- 13 all-time installs (skills.sh)
- Ranked #2,148 of 3,282 Productivity & Planning skills by installs in the Skillselion catalog
- Data as of Jul 29, 2026 (Skillselion catalog sync)
npx skills add https://github.com/duc01226/easyplatform --skill storyAdd your badge
Show developers this skill is listed on Skillselion. Paste this into your README.
| Installs | 13 |
|---|---|
| repo stars | ★ 7 |
| Last updated | June 18, 2026 |
| Repository | duc01226/easyplatform ↗ |
What it does
Creates user stories from PBIs, slices features, and breaks down requirements.
Files
Codex compatibility note:
>
- Invoke repository skills with$skill-namein Codex; this mirrored copy rewrites legacy Claude/skill-namereferences.
- Task tracker mandate: BEFORE executing any workflow or skill step, create/update task tracking for all steps and keep it synchronized as progress changes.
- User-question prompts mean to ask the user directly in Codex.
- Ignore Claude-specific mode-switch instructions when they appear.
- Strict execution contract: when a user explicitly invokes a skill, execute that skill protocol as written.
- Subagent authorization: when a skill is user-invoked or AI-detected and its protocol requires subagents, that skill activation authorizes use of the required spawn_agent subagent(s) for that task.- Do not skip, reorder, or merge protocol steps unless the user explicitly approves the deviation first.
- For workflow skills, execute each listed child-skill step explicitly and report step-by-step evidence.
- If a required step/tool cannot run in this environment, stop and ask the user before adapting.
<!-- CODEX:PROJECT-REFERENCE-LOADING:START -->
Codex Project-Reference Loading (No Hooks)
Codex does not receive Claude hook-based doc injection. When coding, planning, debugging, testing, or reviewing, open project docs explicitly using this routing.
Always read:
docs/project-config.json(project-specific paths, commands, modules, and workflow/test settings)docs/project-reference/docs-index-reference.md(routes to the fulldocs/project-reference/*catalog)docs/project-reference/lessons.md(always-on guardrails and anti-patterns)
Situation-based docs:
- Backend/CQRS/API/domain/entity changes:
backend-patterns-reference.md,domain-entities-reference.md,project-structure-reference.md - Frontend/UI/styling/design-system:
frontend-patterns-reference.md,scss-styling-guide.md,design-system/README.md - Spec/test-case planning or TC mapping:
feature-docs-reference.md - Integration test implementation/review:
integration-test-reference.md - E2E test implementation/review:
e2e-test-reference.md - Code review/audit work:
code-review-rules.mdplus domain docs above based on changed files
Do not read all docs blindly. Start from docs-index-reference.md, then open only relevant files for the task.
<!-- CODEX:PROJECT-REFERENCE-LOADING:END -->
<!-- PROMPT-ENHANCE:STEP-TASK-ANCHOR:START -->
[BLOCKING] Execute skill steps in declared order. NEVER skip, reorder, or merge steps without explicit user approval.
[BLOCKING] Before each step or sub-skill call, update task tracking: setin_progresswhen step starts, setcompletedwhen step ends.
[BLOCKING] Every completed/skipped step MUST include brief evidence or explicit skip reason.
[BLOCKING] If Task tools are unavailable, create and maintain an equivalent step-by-step plan tracker with the same status transitions.
<!-- PROMPT-ENHANCE:STEP-TASK-ANCHOR:END -->
Quick Summary
Goal: Break Product Backlog Items into implementable user stories using vertical slicing, SPIDR splitting, and INVEST criteria.
MANDATORY IMPORTANT MUST ATTENTION Plan ToDo Task to READ the following project-specific reference docs:
>
- project-structure-reference.md -- project patterns and structure<!-- SYNC:estimation-framework -->
Estimation Framework — Bottom-up first; SP DERIVED; output min-max range when likely ≥3d. Stack-agnostic. Baseline: 3-5yr dev, 6 productive hrs/day. AI estimate assumes Claude Code + project context.
>
Method:
>
1. Blast Radius pass (below) — drives code AND test cost
2. Decompose phases → hours/phase → bottom_up_hours = Σ phase_hours3. likely_days = ceil(bottom_up_hours / 6) × productivity_factor4. Sum Risk Margin (base + add-ons) → max_days = likely_days × (1 + margin)5. min_days = likely_days × 0.96. Output as range whenlikely_days ≥3; single point allowed<3(still record margin)
7. man_days_ai = same range × AI speedup8.story_pointsDERIVED fromlikely_daysvia SP-Days — NEVER driver. Disagreement >50% → trust bottom-up
>
Productivity factor: 0.8 strong scaffolding+codegen+AI hooks · 1.0 mature default · 1.2 weak patterns · 1.5 greenfield
>
Cost Driver Heuristic (apply BEFORE work-type row):
>
- UI dominates in CRUD/business apps — 1.5-3x backend (states, validation, responsive, a11y, polish)
- Backend dominates ONLY: multi-aggregate invariants, cross-service contracts, schema migrations, heavy query/perf, new event flows
>
Reuse-vs-Create axis (PRIMARY lever, per layer):
>
| UI tier | Cost |
| -------------------------------------------- | -------- |
| Reuse component on existing screen | 0.1-0.3d |
| Add control/column to existing screen | 0.3-0.8d |
| Compose components into NEW screen | 1-2d |
| NEW screen, custom layout/states/validation | 2-4d |
| NEW shared/common component (themed, tested) | 3-6d+ |
>
| Backend tier | Cost |
| ---------------------------------------------------- | --------- |
| Reuse query/handler from new place | 0.1-0.3d |
| Small update existing handler/entity | 0.3-0.8d |
| NEW query on existing repo/model | 0.5-1d |
| NEW command/handler on existing aggregate (additive) | 1-2d |
| NEW aggregate/entity (repo, validation, events) | 2-4d |
| NEW cross-service contract OR schema migration | 2-4d each |
| Multi-aggregate invariant / heavy domain rule | 3-5d |
>
Rule: Sum tiers across UI+backend+tests, apply productivity factor. Reuse short-circuits tiers — call out.
>
Test-Scope drivers (compute test_count EXPLICITLY — "+tests" hand-wave is #1 failure):
>
| Driver | Count |
| --------------------------------- | ------------------------------------------------------ |
| Happy-path journeys | 1 per story / AC main flow |
| State-machine transitions | reachable transitions × allowed actors |
| Multi-entity state combos | state(A) × state(B) — REACHABLE only, not Cartesian |
| Authorization matrix | (owner, non-owner, elevated, unauth) × each mutation |
| Validation rules | 1 per required field / boundary / format / cross-field |
| UI states (per new screen/dialog) | happy, loading, empty, error, partial — present only |
| Negative paths / invariants | 1 per violatable business rule |
>
| Test tier (Trad, incl. setup+assert+flake) | Cost |
| ------------------------------------------ | -------- |
| 1-5 cases, fixtures reused | 0.3-0.5d |
| 6-12 cases, 1 new fixture | 0.5-1d |
| 13-25 cases, multi-entity setup | 1-2d |
| 26-50 cases OR new state-machine coverage | 2-3d |
| >50 cases OR full E2E journey | 3-5d |
>
Test multipliers: new fixture/seed harness +0.5d · cross-service/bus assertion +0.3d each · UI E2E ×1.5 · each new role +1-2 cases
>
Blast Radius (mandatory pre-pass — affects code AND test):
>
1. Files/components directly modified — count
2. Of those, "complex" (>500 LOC, multi-handler, central, frequently-modified) — count
3. Downstream consumers (callers, event subscribers, cross-service) — list
4. Shared/common code touched (multi-app blast) — yes/no
5. Regression scope — areas needing re-test
>
Rule: Complex touch → add risk_factors. Each downstream consumer → +1-3 regression cases. Blast >5 areas OR >2 complex → re-evaluate SPLIT before estimating.>
Risk Margin (drives max bound):
>
| likely_days | Base margin |
| ------------------- | ------------------------------- |
| <1d trivial | +10% |
| 1-2d small additive | +20% |
| 3-4d real feature | +35% |
| 5-7d large | +50% |
| 8-10d very large | +75% |
| >10d | +100% AND flag SHOULD SPLIT |
>
Risk-factor add-ons (additive — enumerate in `risk_factors`):
>
| Factor | +margin |
| --------------------------------------------------------------------- | ------- |
| touches-complex-existing-feature (>500 LOC, multi-handler, central) | +20% || cross-service-contract change | +25% || schema-migration-on-populated-data | +25% || new-tech-or-unfamiliar-pattern | +30% || regression-fan-out (≥3 downstream areas re-test) | +20% || performance-or-latency-critical | +20% || concurrency-race-event-ordering | +25% || shared-common-code (multi-consumer/multi-app) | +25% || unclear-requirements-or-design | +30% |>
Collapse rule: total margin >100% → STOP, split (padding past 2x is dishonesty). Margin <15% on likely_days ≥5 → under-estimated, widen.>
Work-Type Caps (hard ceilings on `likely_days`):
| Work type | Max SP | Max likely |
| --- | --- | --- |
| Single field / config flag / style fix | 1 | 0.5d |
| Add property to existing model + bind to existing UI | 2 | 1d |
| Additive endpoint + minor UI control (button/menu/column), reuses fixtures | 3 | 2-3d |
| Additive endpoint + NEW UI surface OR additive multi-layer + new domain rule + 2+ test files | 5 | 3-5d |
| NEW model/aggregate OR migration OR cross-module contract OR heavy test (>1.5d) OR NEW UI + non-trivial backend | 8 | 5-7d |
| NEW UI surface + (NEW aggregate OR migration OR cross-service contract) | 13 | SHOULD split |
| Cross-service contract + migration combined | 13 | SHOULD split |
| Beyond | 21 | MUST split |
>
SP→Days (validation only): 1=0.5d/0.25d · 2=1d/0.35d · 3=2d/0.65d · 5=4d/1.0d · 8=6d/1.5d · 13=10d/2.0d (Trad/AI likely)
AI speedup: SP 1≈2x · 2-3≈3x · 5-8≈4x · 13+≈5x. AI cost = (code_gen × 1.3) + (test_gen × 1.3) (30% review overhead).>
MANDATORY frontmatter:
>
```yaml
story_points: <n>
complexity: low | medium | high | critical
man_days_traditional: '<min>-<max>d' # range when likely ≥3d; '<N>d' when <3d
man_days_ai: '<min>-<max>d'
risk_margin_pct: <n> # base + add-ons
risk_factors: [touches-complex-existing-feature, regression-fan-out] # closed-list from add-ons; [] if none
blast_radius:
touched_areas: <n>
complex_touched: <n>
downstream_consumers: [list or count]
shared_common_code: yes | no
estimate_scope_included: [code, integration-tests, frontend, i18n, docs]
estimate_scope_excluded: [unit-tests, e2e, perf, deployment, code-review-rounds]
estimate_reasoning: |
5-7 lines covering:
(a) UI tier — row applied
(b) Backend tier — row applied
(c) Test scope — case breakdown by driver, file count, fixtures, tier row
(d) Cost driver — dominant tier + why
(e) Blast radius — touched, complex, regression scope
(f) Risk factors — list driving margin; why not larger/smaller
Example: "UI: compose Form/Table/Dialog → NEW screen (~1.5d). Backend: NEW command on existing aggregate,
reuses validation+repo (~1d). Tests: 4 transitions × 2 actors + 3 validation + 2 UI states = 13 cases,
1 new fixture → tier 13-25 ~1.5d. Driver: UI composition + new states. Blast: 4 areas, 1 complex.
Risk: base 35% + touches-complex +20% = 55% → max 3.9d → range 2.5-4d."
```
>
Sanity self-check:
>
- likely_days ≥3d and single-point? → reject, must be range- Margin <15% on likely_days ≥5d? → under-estimated, widen- Margin >100%? → STOP, split instead of buffer
- Complex existing feature touched, no regression budget in (c)? → reject- Blast>5areas OR>2complex, no split discussion? → reject
- Purely additive on existing model AND existing UI? → cap SP 3 unless tests >1.5d
- NEW UI surface (page/complex form/dashboard)? → SP 5+ even if backend one endpoint
- Backend cross-service / migration / multi-aggregate? → SP 8+ regardless of UI
- bottom_up_hours / 6 vs SP-Days disagreement >50%? → trust bottom-up, downgrade SP- Without tests, SP drops ≥1 bucket? → tests dominate; state explicitly
- Reasoning called out UI vs backend vs blast vs risk factors? → if missing, add
<!-- /SYNC:estimation-framework -->
- docs/project-reference/domain-entities-reference.md — Domain entity catalog, relationships, cross-service sync (read when task involves business entities/models) (read directly when relevant; do not rely on hook-injected conversation text)- docs/specs/ — Test specifications by module (read existing TCs for related features; include test story/acceptance criteria for new stories)>
If file not found, search for: project documentation, coding standards, architecture docs.
Workflow:
1. Read PBI — Load PBI artifact, acceptance criteria, and domain context 2. Vertical Slice — Identify end-to-end slices of functionality 3. SPIDR Split — Apply Spike/Paths/Interfaces/Data/Rules splitting if effort >5 4. Write Stories — INVEST-validated stories with min 3 GIVEN/WHEN/THEN scenarios each 5. Validate — Interview user to confirm slicing, acceptance criteria, and effort estimates
Key Rules:
Frontend/UI Context (if applicable)
When this task involves frontend or UI changes,
- Component patterns:
docs/project-reference/frontend-patterns-reference.md - Styling/BEM guide:
docs/project-reference/scss-styling-guide.md - Design system tokens:
docs/project-reference/design-system/README.md
- Stories with SP >8 MUST ATTENTION be split; >5 SHOULD be split (see estimation-framework.md)
- All stories MUST ATTENTION include
story_points,complexity,man_days_traditional,man_days_aifields
Greenfield Mode
Auto-detected: If no existing codebase is found (no code directories likesrc/,app/,lib/,server/,packages/, etc., no manifest files likepackage.json/*.sln/go.mod, no populatedproject-config.json), this skill switches to greenfield mode automatically. Planning artifacts (docs/, plans/, .claude/) don't count — the project must have actual code directories with content.
When greenfield is detected:
1. Generate foundation PBIs instead of feature stories: infrastructure setup, project scaffold, CI/CD pipeline, first feature vertical slice 2. Add dependency ordering: infrastructure stories BEFORE feature stories 3. Skip "MUST ATTENTION READ project-structure-reference.md" (won't exist) 4. Include setup stories: dev environment, build tooling, deployment pipeline, monitoring 5. Priority order: infra → scaffold → first feature → remaining features 6. [CRITICAL] Architecture Scaffolding Story: FIRST story = "Architecture Scaffolding" — all OOP/SOLID base abstract classes, generic interfaces, infrastructure abstractions per chosen tech stack. AI self-investigates what base classes the project needs. All feature stories depend on this. 7. Scaffolding acceptance criteria: all base classes compile/type-check, DI/IoC registrations resolve, smoke test passes 8. UI System Foundation Story: If the project has a frontend, generate a "UI System Foundation" story (Sprint 0) with these sub-stories:
| Sub-Story | SP | Priority | Depends On |
|---|---|---|---|
| "Set up design token system" | 2-3 | Must Have | Architecture Scaffolding |
| "Create base layout and responsive grid" | 2-3 | Must Have | Design tokens |
| "Create core UI components (loading, error, empty, toast, button, input)" | 3-5 | Must Have | Design tokens + layout |
Dependency rule: All UI feature stories MUST ATTENTION depend on "UI System Foundation" stories.
- Each story needs happy path, edge case, and error scenario (minimum)
- Use correct project domain vocabulary when available (check project docs for terminology)
Be skeptical. Apply critical thinking, sequential thinking. Every claim needs traced proof, confidence percentages (Idea should be more than 80%).
User Story Creation
Break Product Backlog Items into implementable user stories using vertical slicing and SPIDR patterns.
---
Step 0: Locate Active Plan (if in workflow)
If running within a workflow (big-feature, greenfield-init, etc.):
1. Search for active plan — Glob plans/*/plan.md sorted by modification time, or check the current task list for plan context 2. Read `plan.md` — understand project scope, architecture decisions, domain model, implementation plan 3. Read existing research — {plan-dir}/research/*.md and {plan-dir}/phase-*.md for domain model, tech stack, architecture 4. Read `docs/project-reference/domain-entities-reference.md` (if exists) — understand existing domain entities for accurate story scoping 5. Use plan context to inform story slicing (architecture decisions affect how stories are split)
---
When to Use
- PBI ready for story breakdown
- Feature needs vertical slicing
- Creating sprint-ready work items
- Story too large (effort >8)
---
Quick Reference
Workflow
1. Read PBI artifact and acceptance criteria 2. Load domain context (if project module detected) 3. Identify vertical slices (end-to-end functionality) 4. Apply SPIDR splitting if stories too large 5. Apply INVEST criteria to each story 6. Create user stories with GIVEN/WHEN/THEN (min 3 scenarios) 7. Save to team-artifacts/pbis/stories/ 8. Validate stories (MANDATORY) - Interview user to confirm slicing, acceptance criteria, and effort 9. Suggest next: $tdd-spec or $design-spec
Output
- Path:
team-artifacts/pbis/stories/{YYMMDD}-us-{pbi-slug}.md - Format: Single file with all stories (use ## headers per story)
---
Project Domain Context Loading
When slicing domain-related PBIs, automatically load business context.
Step 1: Detect Module
From PBI frontmatter:
1. Check module field 2. If missing, detect module from docs/business-features/ directory names
Step 2: Load Feature Context
Glob("docs/business-features/{module}/detailed-features/*.md")1. Read module README (first 200 lines) 2. Identify related feature from related_features list 3. Extract existing business rules (BR-{MOD}-XXX) 4. Note entity names from feature docs
Step 3: Apply Domain Vocabulary
Read docs/project-config.json modules[] and docs/business-features/ to detect domain vocabulary per module. Use entity names from feature docs — avoid ambiguous synonyms.
Step 4: Include in Story
## Domain Context
**Module:** {detected module}
**Feature:** {related feature}
**Entities:** {Entity1}, {Entity2}
**Business Rules:** BR-{MOD}-XXX (from feature docs)---
INVEST Criteria
| Criterion | Definition | Validation Question |
|---|---|---|
| Independent | No dependencies on other stories | Can this be developed in any order? |
| Negotiable | Details can change | Is the "how" open for discussion? |
| Valuable | Delivers user value | Does user get observable benefit? |
| Estimable | Can estimate story points | Can team size this? (Fibonacci 1-21) |
| Small | Completable in sprint | SP ≤8? (prefer ≤5) |
| Testable | Clear acceptance criteria | Can we write pass/fail tests? |
---
SPIDR Splitting Checklist
When to apply: Story SP >8 MUST ATTENTION split. SP >5 SHOULD split. SP 13 = SHOULD split into 2-3 stories. SP 21 = MUST ATTENTION split (epic-level).
| Pattern | Question | Split Strategy |
|---|---|---|
| Spike | Unknown complexity? | Create research spike first, then stories |
| Paths | Multiple workflow branches? | One story per path/choice |
| Interfaces | Multiple UIs or APIs? | One story per interface |
| Data | Multiple data formats/types? | One story per data variation |
| Rules | Multiple business rules? | One story per rule variation |
Splitting Examples
Paths: "User can pay by card OR PayPal" → Story A: Card payment, Story B: PayPal payment
Data: "Import CSV, Excel, JSON" → Story A: CSV import, Story B: Excel import, Story C: JSON import
Rules: "Different approval flows by amount" → Story A: <$1000 auto-approve, Story B: >$1000 manager approval
Size Validation
SP 1-5: ✅ Good size
SP 6-8: ⚠️ Consider splitting (apply SPIDR)
SP 13: ❌ SHOULD split into 2-3 stories
SP 21: ❌ MUST ATTENTION split — epic-level, not sprint-ready---
Scenario Templates
Minimum 3 scenarios per story:
1. Happy Path (Positive)
Scenario: User successfully {completes action}
Given {user has required permissions/state}
And {required data exists}
When user {performs valid action}
Then {primary expected outcome}
And {secondary verification if needed}2. Edge Case (Boundary)
Scenario: System handles {boundary condition}
Given {edge state: empty list, max items, zero value}
When user {attempts action at boundary}
Then {appropriate handling: pagination, warning, default}3. Error Case (Negative)
Scenario: System prevents {invalid action}
Given {precondition}
When user {provides invalid input OR unauthorized action}
Then error message "{specific error message}"
And {system remains in valid state}
And {no partial changes saved}4. Authorization (MANDATORY per story)
Scenario: Unauthorized user cannot {perform action}
Given user has role {unauthorized role}
When user attempts to {action}
Then system rejects with "Forbidden" or "Unauthorized"
And no data is modifiedAdditional Scenario Types
Performance: Response time under load Concurrency: Simultaneous user actions Integration: External service unavailable
---
AI-SDD Mandate Gate (M1-M5) — BLOCKING
See .claude/skills/shared/sdd-artifact-contract.md → "AI-SDD Mandates (M1-M6)" for BLOCKING criteria. Every generated story MUST satisfy M1-M5:
- Separate intent from implementation (M1/M2): The story narrative and acceptance criteria stay tech-agnostic — describe observable business behavior, no framework/product/language/design-pattern names, no source identifiers. Keep optional hints in
## Technical Notesand source references in evidence carriers as stack-portable abstract anchors ([Source: namespace/service/id], neverfile:line). Prose followsdocs/project-reference/spec-principles.md§3. - Logical Requirement ID (M3): Each story carries a logical requirement ID (
FR-/BR-) inherited from its parent PBI as the PRIMARY citation spine; keep the[Source: namespace/service/id]abstract anchor as a SECONDARY, stack-portable carrier — KEEP it, never remove it and never replace it withfile:line(physical coordinates live only in the provenance sidecar). - Testable GWT/EARS criteria (M4): Every Given/When/Then or EARS criterion has ONE valid interpretation, observable completion states, and named failure modes — no vague phrasing ("fast", "user-friendly", "handle appropriately") and no implementation details.
- Rebuild-from-scratch (M5): A team with zero codebase knowledge can implement identical behavior on ANY stack from the story alone.
[STOP — rework before emitting] Reject and rework a story when ANY of these failure conditions holds:
>
1. Tech-specific prose — narrative/criteria name a framework, product, language type, or design-pattern class.
2. Source code reference in prose — a class/method name, file path, or namespace appears outside an evidence carrier.
3. Missing logical ID or evidence — noFR-/BR-ID, OR a requirement/rule with no[Source: namespace/service/id]abstract-anchor evidence (or explicitTBD (pre-implementation)marker).
4. Vague acceptance criteria — non-testable, non-observable, or more than one valid interpretation.
5. Not implementable from the artifact alone — a reader would have to read source or guess a rule, limit, role, or failure mode.
---
Story Artifact Template
````markdown --- id: US-{YYMMDD}-{NNN} parent_pbi: '{PBI-ID}' title: '{Brief story title}' persona: '{User persona}' priority: P1 | P2 | P3 story_points: 1 | 2 | 3 | 5 | 8 | 13 complexity: Low | Medium | High | Very High man_days_traditional: '{ Xd (Yd code + Zd test) — from SP table }' man_days_ai: '{ Xd (Yd code + Zd test) — from SP table with AI }' sprint: 0 | 1 | 2 | ... status: draft | ready | in_progress | done module: '{ServiceA | ServiceB | ServiceC | ServiceD}' ---
User Stories for {PBI Title}
Story 1: {Title}
As a {user role} I want {goal} So that {benefit}
Acceptance Criteria
Scenario 1: {Happy path title}
Given {context}
When {action}
Then {outcome}````
Scenario 2: {Edge case title}
Given {edge state}
When {action}
Then {handling}Scenario 3: {Error case title}
Given {context}
When {invalid action}
Then error "{message}"---
Story 2: {Title}
{Repeat structure...}
---
Out of Scope
- {Explicitly excluded items}
Story Dependencies
| Story | Depends On | Type | Reason |
|---|---|---|---|
| US-{NNN} | - | independent | First slice, no dependencies |
| US-{NNN} | US-{NNN} | must-after | Needs entity/API from prior story |
| US-{NNN} | US-{NNN} | can-parallel | Independent feature slice |
| US-{NNN} | US-{NNN} | blocked-by | Requires external service/infra |
Domain Context
Module: {module} Related Feature: {feature doc path} Entities: {Entity1}, {Entity2} Requirement IDs (M3 — inherited from PBI): {FR-XXX / BR-XXX — primary citation spine} Business Rules: {BR-XXX references} Evidence (secondary, stack-portable): {[Source: namespace/service/id] abstract anchor per requirement, or TBD (pre-implementation)}
UI Wireframe
Layout
{ASCII wireframe showing this story's UI slice — see UI wireframe protocol}
Components
- {ComponentName} — {behavior for this story} _(tier: common | domain-shared | page/app)_
Classify per Component Hierarchy in UI wireframe protocol — search existing libs before proposing new components.Interaction Flow
1. User {action} on {component} 2. System {response/feedback} 3. UI updates to show {result}
States
| State | Behavior |
|---|---|
| Default | {what user sees initially} |
| Loading | {spinner/skeleton} |
| Empty | {empty state message} |
| Error | {error handling} |
If backend-only:## UI Wireframe→N/A — Backend-only change. No UI affected.
Technical Notes
- {Implementation hints if needed}
Validation Summary
Validated: {date}
Confirmed
- {decision}: {user choice}
Action Items
- [ ] {follow-up if any}
````
---
Sprint 0 / Foundation Stories (Production Readiness)
When the PBI includes a "Production Readiness Concerns" table with "Required" items, automatically generate Sprint 0 / foundation stories for each concern:
| PBI Concern | Story Title | Story Points | Priority |
|---|---|---|---|
| Code linting/analyzers = Required | "Set up code linting and formatting" | 1-2 SP | Must Have |
| Error handling setup = Required | "Set up error handling foundation" | 2-3 SP | Must Have |
| Loading indicators = Required | "Set up loading indicator infrastructure" | 1-2 SP | Must Have |
| Docker integration = Required | "Set up Docker development environment" | 2-3 SP | Must Have |
| CI/CD quality gates = Required | "Set up CI/CD quality gates" | 2-3 SP | Must Have |
| Seed data = Required | "Set up seed data / data seeder" | 2-3 SP | Must Have |
| Data migration = Required | "Create data migration for schema changes" | 1-3 SP | Must Have |
Rules
- Foundation stories MUST ATTENTION be completed before feature stories begin
- Mark as
sprint: 0orsprint: foundationin story metadata - Each foundation story references the specific protocol section for implementation guidance
- If PBI concern = "Existing", skip story generation (already set up)
- If PBI concern = "No", skip story generation (explicitly opted out)
---
Anti-Patterns to Avoid
| Anti-Pattern | Problem | Correct Approach |
|---|---|---|
| Horizontal slicing | "Backend story" + "Frontend story" = delays value | Vertical slice: thin end-to-end functionality |
| Single scenario | Missing edge/error cases | Minimum 3 scenarios: happy, edge, error |
| Vague criteria | "Fast", "user-friendly" untestable | Quantify: "< 200ms", "≤ 3 clicks" |
| Solution-speak | "Use Redis cache" constrains team | Outcome: "Results return within 200ms" |
| Effort >8 | Won't fit sprint, hard to estimate | Apply SPIDR, split until ≤8 |
| No error scenario | Missing negative test coverage | Always include invalid input handling |
| Generic persona | "As a user" too vague | Specific: "As a hiring manager" |
---
Key Rules
- Every story set MUST ATTENTION include a Story Dependencies table — with types:
must-after,can-parallel,blocked-by,independent. This enables$prioritizeand$planto respect implementation ordering. - SPIDR splits MUST ATTENTION include dependency chains — When splitting a story, declare which split stories depend on others.
- No orphan stories — Every story must appear in the dependency table, even if independent.
Quality Checklist
Before completing user stories:
- [ ] Each story follows "As a... I want... So that..." format
- [ ] SPIDR splitting applied (effort ≤8, prefer ≤5)
- [ ] At least 3 scenarios per story: happy, edge, error
- [ ] All scenarios use GIVEN/WHEN/THEN format
- [ ] Effort estimated in Fibonacci (1, 2, 3, 5, 8)
- [ ] Stories independent (can develop in any order)
- [ ] Out of scope explicitly listed
- [ ] Story Dependencies table included with all stories listed
- [ ] Dependency types correct (must-after, can-parallel, blocked-by, independent)
- [ ] Parent PBI linked in frontmatter
- [ ] Domain vocabulary used correctly (if the project)
- [ ] Authorization scenario included per story (unauthorized access rejection)
- [ ] Seed data story included if PBI has seed data requirements
- [ ] Data migration story included if PBI has schema changes
- [ ] Validation interview completed
---
Validation Step (MANDATORY)
After creating user stories, validate with user.
Question Categories
| Category | Example Question |
|---|---|
| Slicing | "Are the story slices independent enough?" |
| Size | "Any story >8 effort that needs further splitting?" |
| Scenarios | "Any acceptance criteria missing for edge cases?" |
| Dependencies | "Are there hidden dependencies between stories?" |
| Scope | "Should anything be explicitly excluded?" |
Process
1. Generate 2-4 questions focused on slicing quality, scenarios, and dependencies 2. Use a direct user question tool to interview 3. Document in story artifact under ## Validation Summary 4. Update stories based on answers (split if needed)
This step is NOT optional.
---
Related
| Type | Reference |
|---|---|
| Role Skill | business-analyst |
| Command | $story |
| Input | $refine output (PBI) |
| Next Steps | $tdd-spec, $design-spec, $prioritize |
---
MANDATORY: Systematic Task Breakdown for Stories
MANDATORY IMPORTANT MUST ATTENTION break down ALL stories into small, systematic todo tasks using task tracking BEFORE starting implementation. Each story MUST ATTENTION have its own set of tasks that cover:
1. Read & understand story — Load story artifact, acceptance criteria, domain context 2. Identify vertical slice layers — Backend entity/command/query, frontend component/store/API, integration points 3. Create implementation subtasks per layer — One task per file or logical unit (entity, command handler, DTO, component, service, test) 4. Include spec tasks — Each story MUST ATTENTION have corresponding test specifications (unit, integration, or E2E as appropriate) 5. Include validation task — Verify story against acceptance criteria GIVEN/WHEN/THEN after implementation 6. Include review task — Final quality check per story
Task Naming Convention
[Story US-{ID}] {Layer}: {Description}
Example for a "Create Goal" story:
[Story US-001] Entity: Create Goal entity with validation rules
[Story US-001] Command: CreateGoalCommand + Handler
[Story US-001] DTO: GoalDto with mapping
[Story US-001] API: POST /api/goals endpoint
[Story US-001] Component: GoalCreateFormComponent
[Story US-001] Store: GoalVmStore with create action
[Story US-001] Test: Integration test for CreateGoalCommand
[Story US-001] Test: E2E test for goal creation flow
[Story US-001] Review: Verify against AC scenarios
Why: Without systematic task breakdown, stories become monolithic — leading to missed edge cases, incomplete specs, and context loss during implementation.
---
Next Steps
MANDATORY IMPORTANT MUST ATTENTION — NO EXCEPTIONS after completing this skill, you MUST ATTENTION use a direct user question to present these options. Do NOT skip because the task seems "simple" or "obvious" — the user decides:
- "$tdd-spec (Recommended)" — Generate test specifications from stories
- "$pbi-mockup" — Generate HTML mockup report from PBI and stories
- "$plan-validate" — If stories need validation against plan
- "Skip, continue manually" — user decides
[IMPORTANT] Use task tracking to break ALL work into small tasks BEFORE starting — including tasks for each file read. This prevents context loss from long files. For simple tasks, AI MUST ATTENTION ask user whether to skip.
External Memory: For complex or lengthy work (research, analysis, scan, review), write intermediate findings and final results to a report file in plans/reports/ — prevents context loss and serves as deliverable.Evidence Gate: MANDATORY IMPORTANT MUST ATTENTION — every claim, finding, and recommendation requires file:line proof or traced evidence with confidence percentage (>80% to act, <80% must verify first).<!-- SYNC:ui-system-context -->
UI System Context — For ANY task touching.ts,.html,.scss, or.cssfiles:
>
MUST ATTENTION READ before implementing:
>
1. docs/project-reference/frontend-patterns-reference.md — component base classes, stores, forms2. docs/project-reference/scss-styling-guide.md — BEM methodology, SCSS variables, mixins, responsive3. docs/project-reference/design-system/README.md — design tokens, component inventory, icons>
Reference docs/project-config.json for project-specific paths.<!-- /SYNC:ui-system-context -->
<!-- SYNC:ui-wireframe -->
UI Wireframe — For UI artifacts: include ASCII wireframe (box-drawing chars), component tree with EXISTING/NEW classification and tier (common | domain-shared | page/app), interaction flow (user action → system response → UI update), states table (default/loading/empty/error), and responsive breakpoint behavior. Process Figma URLs or screenshots BEFORE wireframing. Search existing component libs before proposing new components. Backend-only changes: N/A — Backend-only change. No UI affected.<!-- /SYNC:ui-wireframe -->
<!-- SYNC:critical-thinking-mindset -->
Critical Thinking Mindset — Apply critical thinking, sequential thinking. Every claim needs traced proof, confidence >80% to act.
Anti-hallucination: Never present guess as fact — cite sources for every claim, admit uncertainty freely, self-check output for errors, cross-reference independently, stay skeptical of own confidence — certainty without evidence root of all hallucination.
<!-- /SYNC:critical-thinking-mindset -->
<!-- SYNC:sequential-thinking-protocol -->
Sequential Thinking Protocol — Structured multi-step reasoning for complex/ambiguous work. Use when planning, reviewing, debugging, or refining ideas where one-shot reasoning is unsafe.
>
Trigger when: complex problem decomposition · adaptive plans needing revision · analysis with course correction · unclear/emerging scope · multi-step solutions · hypothesis-driven debugging · cross-cutting trade-off evaluation.
>
Format (explicit mode — visible thought trail):
>
1. Thought N/M: [aspect] — one aspect per thought, state assumptions/uncertainty2. Thought N/M [REVISION of Thought K]: ... — when prior reasoning invalidated; state Original / Why revised / Impact3. Thought N/M [BRANCH A from Thought K]: ... — explore alternative; converge with decision rationale4.Thought N/M [HYPOTHESIS]: ...then[VERIFICATION]: ...— test before acting
5. Thought N/N [FINAL] — only when verified, all critical aspects addressed, confidence >80%>
Mandatory closers: Confidence % stated · Assumptions listed · Open questions surfaced · Next action concrete.
>
Stop conditions: confidence <80% on any critical decision → escalate via ask the user directly · ≥3 revisions on same thought → re-frame the problem · branch count >3 → split into sub-task.
>
Implicit mode: apply methodology internally without visible markers when adding markers would clutter the response (routine work where reasoning aids accuracy).
>
Deep-dive: see$sequential-thinkingskill (.claude/skills/sequential-thinking/SKILL.md) for worked examples (api-design, debug, architecture), advanced techniques (spiral refinement, hypothesis testing, convergence), and meta-strategies (uncertainty handling, revision cascades).
<!-- /SYNC:sequential-thinking-protocol -->
<!-- SYNC:ai-mistake-prevention -->
AI Mistake Prevention — Failure modes to avoid on every task: Check downstream references before deleting. Deleting components causes documentation and code staleness cascades. Map all referencing files before removal. Verify AI-generated content against actual code. AI hallucinates APIs, class names, and method signatures. Always grep to confirm existence before documenting or referencing. Trace full dependency chain after edits. Changing a definition misses downstream variables and consumers derived from it. Always trace the full chain. Trace ALL code paths when verifying correctness. Confirming code exists is not confirming it executes. Always trace early exits, error branches, and conditional skips — not just happy path. When debugging, ask "whose responsibility?" before fixing. Trace whether bug is in caller (wrong data) or callee (wrong handling). Fix at responsible layer — never patch symptom site. Assume existing values are intentional — ask WHY before changing. Before changing any constant, limit, flag, or pattern: read comments, check git blame, examine surrounding code. Verify ALL affected outputs, not just the first. Changes touching multiple stacks require verifying EVERY output. One green check is not all green checks. Holistic-first debugging — resist nearest-attention trap. When investigating any failure, list EVERY precondition first (config, env vars, DB names, endpoints, DI registrations, data preconditions), then verify each against evidence before forming any code-layer hypothesis. Surgical changes — apply the diff test. Bug fix: every changed line must trace directly to the bug. Don't restyle or improve adjacent code. Enhancement task: implement improvements AND announce them explicitly. Surface ambiguity before coding — don't pick silently. If request has multiple interpretations, present each with effort estimate and ask. Never assume all-records, file-based, or more complex path.
<!-- /SYNC:ai-mistake-prevention -->
<!-- SYNC:estimation-framework:reminder -->
- MANDATORY MUST ATTENTION estimation: bottom-up phase hours drive
man_days_traditional(Σh/6 × productivity_factor); SP DERIVED. UI cost usually dominates — bump SP one bucket if NEW UI surface (page/complex form/dashboard). Frontmatter MUST includestory_points,complexity,man_days_traditional,man_days_ai,estimate_scope_included,estimate_scope_excluded,estimate_reasoning(UI vs backend cost driver). Cap SP 3 for additive-on-existing-model+existing-UI unless test scope >1.5d. SP 13 SHOULD split, SP 21 MUST split.
<!-- /SYNC:estimation-framework:reminder -->
<!-- SYNC:ui-system-context:reminder -->
IMPORTANT MUST ATTENTION read frontend-patterns-reference, scss-styling-guide, design-system/README before any UI change.
<!-- /SYNC:ui-system-context:reminder -->
<!-- SYNC:critical-thinking-mindset:reminder -->
MUST ATTENTION apply critical thinking — every claim needs traced proof, confidence >80% to act. Anti-hallucination: never present guess as fact.
<!-- /SYNC:critical-thinking-mindset:reminder -->
<!-- SYNC:sequential-thinking-protocol:reminder -->
MUST ATTENTION apply sequential-thinking — multi-step Thought N/M, REVISION/BRANCH/HYPOTHESIS markers, confidence % closer; see $sequential-thinking skill.
<!-- /SYNC:sequential-thinking-protocol:reminder -->
<!-- SYNC:ai-mistake-prevention:reminder -->
MUST ATTENTION apply AI mistake prevention — holistic-first debugging, fix at responsible layer, surface ambiguity before coding, re-read files after compaction.
<!-- /SYNC:ai-mistake-prevention:reminder -->
<!-- PROMPT-ENHANCE:STEP-TASK-CLOSING:START -->
Prompt-Enhance Closing Anchors
IMPORTANT MUST ATTENTION follow declared step order for this skill; NEVER skip, reorder, or merge steps without explicit user approval IMPORTANT MUST ATTENTION for every step/sub-skill call: set in_progress before execution, set completed after execution IMPORTANT MUST ATTENTION every skipped step MUST include explicit reason; every completed step MUST include concise evidence IMPORTANT MUST ATTENTION if Task tools unavailable, maintain an equivalent step-by-step plan tracker with synchronized statuses
<!-- PROMPT-ENHANCE:STEP-TASK-CLOSING:END -->
Closing Reminders
MANDATORY IMPORTANT MUST ATTENTION break work into small todo tasks using task tracking BEFORE starting. MANDATORY IMPORTANT MUST ATTENTION validate decisions with user via a direct user question — never auto-decide. MANDATORY IMPORTANT MUST ATTENTION add a final review todo task to verify work quality. ````
MANDATORY IMPORTANT MUST ATTENTION READ the following files before starting:
[TASK-PLANNING] Before acting, analyze task scope and systematically break it into small todo tasks and sub-tasks using task tracking.
[IMPORTANT] Analyze how big the task is and break it into many small todo tasks systematically before starting — this is very important.
<!-- CODEX:SYNC-PROMPT-PROTOCOLS:START -->
Hookless Prompt Protocol Mirror (Auto-Synced)
Source: .claude/hooks/lib/prompt-injections.cjs + .claude/.ck.json
[WORKFLOW-EXECUTION-PROTOCOL] [BLOCKING] Workflow Execution Protocol — MANDATORY IMPORTANT MUST CRITICAL. Do not skip for any reason.
Generic portability boundary: Reusable skills and protocol text stay project-neutral; project-specific conventions are discovered from docs/project-config.json and docs/project-reference/. Apply shared AI-SDD from shared/sdd-artifact-contract.md. Read docs/project-config.json and docs/project-reference/docs-index-reference.md, then open the project reference docs named there. Any supported AI tool may execute when this shared context and local docs are available.
1. DETECT: Match prompt against workflow catalog 2. ANALYZE: Find best-match workflow AND evaluate if a custom step combination would fit better 3. ASK (REQUIRED FORMAT): Use a direct user question with this structure unless the user explicitly invoked a workflow/skill and the local protocol treats explicit invocation as confirmation:
- Question: "Which workflow do you want to activate?"
- Option 1: "Activate [BestMatch Workflow] (Recommended)"
- Option 2: "Activate custom workflow: [step1 → step2 → ...]" (include one-line rationale)
4. ACTIVATE (if confirmed): Call $workflow-start <workflowId> for standard; sequence custom steps manually 5. CREATE TASKS: task tracking for ALL workflow steps 6. EXECUTE: Follow each step in sequence [CRITICAL-THINKING-MINDSET] Apply critical thinking, sequential thinking. Every claim needs traced proof, confidence >80% to act. Anti-hallucination principle: Never present guess as fact — cite sources for every claim, admit uncertainty freely, self-check output for errors, cross-reference independently, stay skeptical of own confidence — certainty without evidence root of all hallucination. AI Attention principle (Primacy-Recency): Put the 3 most critical rules at both top and bottom of long prompts/protocols so instruction adherence survives long context windows. Goal-driven execution: Define success criteria first, loop until verified, and stop only when observable checks pass. Tests verify intent: Tests must protect business rules/invariants and fail when the protected intent breaks, not only mirror current behavior.
[LESSON-LEARNED-REMINDER] [BLOCKING] Task Planning & Continuous Improvement — MANDATORY. Do not skip.
Break work into small tasks (task tracking) before starting. Add final task: "Analyze AI mistakes & lessons learned".
Extract lessons — ROOT CAUSE ONLY, not symptom fixes:
1. Name the FAILURE MODE (reasoning/assumption failure), not symptom — "assumed API existed without reading source" not "used wrong enum value". 2. Generality test: does this failure mode apply to ≥3 contexts/codebases? If not, abstract one level up. 3. Write as a universal rule — strip project-specific names/paths/classes. Useful on any codebase. 4. Consolidate: multiple mistakes sharing one failure mode → ONE lesson. 5. Recurrence gate: "Would this recur in future session WITHOUT this reminder?" — No → skip $learn. 6. Auto-fix gate: "Could $code-review/$code-simplifier/$security/$lint catch this?" — Yes → improve review skill instead. 7. BOTH gates pass → ask user to run $learn. [TASK-PLANNING] [MANDATORY] BEFORE executing any workflow or skill step, create/update task tracking for all planned steps, then keep it synchronized as each step starts/completes.
<!-- CODEX:SYNC-PROMPT-PROTOCOLS:END -->