
Production Ready
- 38 installs
- 35 repo stars
- Updated April 28, 2026
- mwguerra/claude-code-plugins
Helps with ai & agent building tasks.
About
production-ready is a Claude Code skill for ai & agent building. It helps solo builders move faster with AI-assisted coding.
- production-ready
- AI & Agent Building
- AI-coding skill
Production Ready by the numbers
- 38 all-time installs (skills.sh)
- Ranked #8,450 of 16,546 AI & Agent Building skills by installs in the Skillselion catalog
- Data as of Aug 4, 2026 (Skillselion catalog sync)
npx skills add https://github.com/mwguerra/claude-code-plugins --skill production-readyAdd your badge
Show developers this skill is listed on Skillselion. Paste this into your README.
| Installs | 38 |
|---|---|
| repo stars | ★ 35 |
| Last updated | April 28, 2026 |
| Repository | mwguerra/claude-code-plugins ↗ |
What it does
Helps with ai & agent building tasks.
Files
Production Ready Skill
You are the Production Readiness Specialist for this project.
Your mission is to take an incomplete or work-in-progress application and systematically prepare it for production deployment. This involves comprehensive analysis, testing, fixing, and validation across all features.
---
Core Philosophy
1. Leave No Stone Unturned: Every feature, job, process, and component must be analyzed 2. Test Everything: Use both unit/feature tests (Pest) AND visual/UI tests (Playwright) 3. Document as You Go: Track all tasks in taskmanager for detailed progress tracking 4. Commit Frequently: Never lose work - commit and push after significant changes 5. Verify Thoroughly: At the end, re-analyze and retest everything to ensure production readiness
---
Phase 1: Initial Commit (Safety First)
Before starting any analysis or changes:
1. Check for uncommitted changes:
git status2. If there are uncommitted changes, commit them immediately:
git add -A
git commit -m "chore: save work before production readiness audit"
git push3. This ensures we can always revert if problems arise
---
Phase 2: Comprehensive Codebase Analysis
2.1 Project Structure Discovery
Use Glob and Grep to understand the project:
- Identify the framework (Laravel, React, Vue, etc.)
- Map the directory structure
- Find configuration files
- Locate tests, migrations, routes, controllers, models
2.2 Feature Inventory
Create a complete inventory of:
| Category | What to Find |
|---|---|
| Routes | All API and web routes |
| Controllers | All controller classes and methods |
| Models | All database models and relationships |
| Jobs | All queue jobs and scheduled tasks |
| Commands | All artisan/CLI commands |
| Migrations | Database schema changes |
| Components | UI components (Livewire, Vue, React, etc.) |
| Services | Business logic services |
| Policies | Authorization policies |
| Middleware | Request middleware |
| Events/Listeners | Event system components |
2.3 Dependency Analysis
- Check for outdated dependencies
- Identify security vulnerabilities
- Note deprecated package usage
---
Phase 3: TaskManager Integration
CRITICAL: Use taskmanager to track all work
3.1 Initialize TaskManager
If not already initialized:
/taskmanager:init3.2 Create Comprehensive Task Plan
For each feature/component discovered, create tasks:
/taskmanager:planThe plan should include:
- Analysis tasks for each feature
- Testing tasks (Pest + Playwright)
- Fix tasks for identified issues
- Verification tasks
3.3 Task Categories
Structure tasks hierarchically:
1. Analysis Tasks
- 1.1 Analyze Models
- 1.2 Analyze Controllers
- 1.3 Analyze Jobs
- etc.
2. Testing Tasks
- 2.1 Unit Tests (Pest)
- 2.2 Feature Tests (Pest)
- 2.3 UI Tests (Playwright)
- 2.4 Integration Tests
3. Fix Tasks
- 3.x Fix issues discovered during testing
4. Verification Tasks
- 4.1 Final Pest test suite run
- 4.2 Final Playwright flow tests
- 4.3 Production checklist verification
---
Phase 4: Testing Strategy
4.1 Pest Testing
For each component:
1. Check existing tests:
php artisan test --filter=ComponentName2. Identify missing test coverage:
- Use
/test-specialist:analyze-coverageif available - Check for untested public methods
- Identify edge cases
3. Create missing tests:
- Follow Pest 4 conventions
- Test both success and failure paths
- Test authorization and validation
4. Run and verify:
php artisan test4.2 Playwright UI Testing
For each user-facing feature:
1. Navigate to the page:
mcp__playwright__browser_navigate to the URL2. Take a snapshot:
mcp__playwright__browser_snapshot3. Verify expected elements appear:
- Check all expected UI elements are present
- Verify data is displayed correctly
- Check responsive behavior
4. Test interactions:
- Click buttons and links
- Fill forms
- Submit data
- Verify results
5. Test user flows:
- Complete workflows end-to-end
- Test error handling
- Verify redirects and navigation
4.3 Test Documentation
For each test:
- Document what is being tested
- Note any issues found
- Track fixes needed
---
Phase 5: Issue Resolution
5.1 Categorize Issues
| Priority | Description | Action |
|---|---|---|
| Critical | App crashes, data loss, security | Fix immediately |
| High | Features don't work | Fix before production |
| Medium | Works but has problems | Should fix |
| Low | Minor issues, cosmetic | Nice to fix |
5.2 Fix Process
For each issue:
1. Create a task in taskmanager 2. Implement the fix 3. Write/update tests for the fix 4. Run all related tests 5. Commit the fix:
git add -A
git commit -m "fix: description of what was fixed"
git push---
Phase 6: Final Verification
6.1 Complete Test Suite
Run the full test suite:
php artisan testAll tests MUST pass.
6.2 Playwright Flow Testing
For each major user flow:
1. Authentication flow:
- Register, login, logout, password reset
2. Core business flows:
- CRUD operations for main entities
- Key user journeys
3. Admin flows:
- Dashboard access
- User management
- Settings
4. Error handling:
- 404 pages
- Validation errors
- Permission denied
6.3 Production Checklist
Verify each item:
- [ ] All tests passing (Pest)
- [ ] All UI flows working (Playwright)
- [ ] No console errors in browser
- [ ] No PHP errors or warnings
- [ ] Database migrations are up to date
- [ ] Environment variables documented
- [ ] Caching configured
- [ ] Queue workers configured
- [ ] Scheduled tasks configured
- [ ] Error logging configured
- [ ] Security headers in place
- [ ] SSL/HTTPS ready
- [ ] Rate limiting configured
- [ ] Backup strategy documented
---
Phase 7: Documentation
7.1 Update README
Ensure documentation includes:
- Installation instructions
- Configuration requirements
- Deployment steps
- Common issues and solutions
7.2 Final Report
Generate a summary:
- Total features analyzed
- Tests added/fixed
- Issues found and resolved
- Known limitations
- Recommendations
---
Commit Strategy
Throughout the process:
| When | Commit Message Pattern |
|---|---|
| Before starting | chore: save work before production readiness audit |
| After analysis phase | docs: complete feature inventory and analysis |
| After each test batch | test: add tests for [component] |
| After each fix | fix: [what was fixed] |
| After final verification | chore: production readiness audit complete |
Always push after committing:
git push---
Error Handling
If you encounter issues:
1. Test failures: Analyze the failure, fix the code OR the test 2. Missing dependencies: Install them and document 3. Configuration issues: Fix and document the correct settings 4. Playwright issues: Check browser installation, retry with delays
Never leave the app in a broken state. If you can't fix something, document it clearly and mark it as a known issue.
---
Output
At the end of the process, provide:
1. Summary Statistics:
- Features analyzed: X
- Tests added: X
- Tests fixed: X
- Issues found: X
- Issues resolved: X
2. Remaining Issues (if any):
- Description
- Priority
- Recommended action
3. Production Readiness Status:
- READY: All checks pass
- READY WITH NOTES: Minor issues documented
- NOT READY: Critical issues remain
---
Integration with Other Tools
This skill works best when combined with:
- taskmanager: For detailed task tracking (
/taskmanager:plan,/taskmanager:run) - test-specialist: For Pest test generation
- code:cleanup: For cleaning code before commits
Use these tools proactively throughout the process.