Prioritization
- 81 installs
- 213 repo stars
- Updated August 4, 2026
- yonatangross/orchestkit
Helps with ai & agent building tasks.
About
prioritization is a Claude Code skill for ai & agent building. It helps solo builders move faster with AI-assisted coding.
- prioritization
- AI & Agent Building
- AI-coding skill
Prioritization by the numbers
- 81 all-time installs (skills.sh)
- Ranked #5,179 of 16,546 AI & Agent Building skills by installs in the Skillselion catalog
- Data as of Aug 5, 2026 (Skillselion catalog sync)
npx skills add https://github.com/yonatangross/orchestkit --skill prioritizationAdd your badge
Show developers this skill is listed on Skillselion. Paste this into your README.
| Installs | 81 |
|---|---|
| repo stars | ★ 213 |
| Last updated | August 4, 2026 |
| Repository | yonatangross/orchestkit ↗ |
What it does
Helps with ai & agent building tasks.
Files
Prioritization Frameworks
Score, rank, and justify backlog decisions using the right framework for the situation.
Decision Tree: Which Framework to Use
Do you have a hard deadline or regulatory pressure?
YES → WSJF (Cost of Delay drives sequencing)
NO → Do you have reach/usage data?
YES → RICE (data-driven, accounts for user reach)
NO → Are you in a time-boxed planning session?
YES → ICE (fast, 1-10 scales, no data required)
NO → Is this a scope negotiation with stakeholders?
YES → MoSCoW (bucket features, control scope creep)
NO → Value-Effort Matrix (quick 2x2 triage)| Framework | Best For | Data Required | Time to Score |
|---|---|---|---|
| RICE | Data-rich teams, steady-state prioritization | Analytics, user counts | 30-60 min |
| WSJF | SAFe orgs, time-sensitive or regulated work | Relative estimates only | 15-30 min |
| ICE | Startup speed, early validation, quick triage | None | 5-10 min |
| MoSCoW | Scope negotiation, release planning | Stakeholder input | 1-2 hours |
| Value-Effort | 2x2 visual, quick team alignment | None | 10-15 min |
---
RICE
RICE Score = (Reach × Impact × Confidence) / Effort| Factor | Scale | Notes |
|---|---|---|
| Reach | Actual users/quarter | Use analytics; do not estimate |
| Impact | 0.25 / 0.5 / 1 / 2 / 3 | Minimal → Massive per user |
| Confidence | 0.3 / 0.5 / 0.8 / 1.0 | Moonshot → Strong data |
| Effort | Person-months | Include design, eng, QA |
## RICE Scoring: [Feature Name]
| Feature | Reach | Impact | Confidence | Effort | Score |
|-------------|--------|--------|------------|--------|--------|
| Smart search| 50,000 | 2 | 0.8 | 3 | 26,667 |
| CSV export | 10,000 | 0.5 | 1.0 | 0.5 | 10,000 |
| Dark mode | 30,000 | 0.25 | 1.0 | 1 | 7,500 |See rules/prioritize-rice.md for ICE, Kano, and full scale tables.
---
WSJF
WSJF = Cost of Delay / Job Size
Cost of Delay = User Value + Time Criticality + Risk Reduction (1-21 Fibonacci each)Higher WSJF = do first. Fibonacci scale (1, 2, 3, 5, 8, 13, 21) forces relative sizing.
## WSJF: GDPR Compliance Update
User Value: 8 (required for EU customers)
Time Criticality: 21 (regulatory deadline this quarter)
Risk Reduction: 13 (avoids significant fines)
Job Size: 8 (medium complexity)
Cost of Delay = 8 + 21 + 13 = 42
WSJF = 42 / 8 = 5.25See rules/prioritize-wsjf.md for MoSCoW buckets and practical tips. See references/wsjf-guide.md for the full scoring guide.
---
ICE
ICE Score = Impact × Confidence × Ease (all factors 1-10)No user data required. Score relative to other backlog items. Useful for early-stage products and rapid triage sessions.
---
MoSCoW
Bucket features before estimation. Must-Haves alone should ship a viable product.
## Release 1.0 MoSCoW
### Must Have (~60% of effort)
- [ ] User authentication
- [ ] Core CRUD operations
### Should Have (~20%)
- [ ] Search, export, notifications
### Could Have (~20%)
- [ ] Dark mode, keyboard shortcuts
### Won't Have (documented out-of-scope)
- Mobile app (Release 2.0)
- AI features (Release 2.0)---
Opportunity Cost & Trade-Off Analysis
When two items compete for the same team capacity, quantify what delaying each item costs per month.
## Trade-Off: AI Search vs Platform Migration (Q2 eng team)
### Option A: AI Search
- Cost of Delay: $25K/month (competitive risk)
- RICE Score: 18,000
- Effort: 6 weeks
### Option B: Platform Migration
- Cost of Delay: $5K/month (tech debt interest)
- RICE Score: 4,000
- Effort: 8 weeks
### Recommendation
Human decides. Key factors:
1. Q2 OKR: Increase trial-to-paid conversion (favors AI Search)
2. Engineering capacity: Only one team, sequential not parallel
3. Customer commitment: No contractual deadline for eitherSee rules/prioritize-opportunity-cost.md for the Value-Effort Matrix and full trade-off template. See references/rice-scoring-guide.md for detailed RICE calibration.
---
Common Pitfalls
| Pitfall | Mitigation |
|---|---|
| Gaming scores to justify pre-decided work | Calibrate as a team; document assumptions |
| Mixing frameworks in one table | Pick one framework per planning session |
| Only tracking high-RICE items; ignoring cost of delay | Combine RICE with explicit delay cost analysis |
| MoSCoW Must-Have bloat (>70% of scope) | Must-Haves alone must ship a viable product |
| Comparing RICE scores across different goals | Only compare within the same objective |
---
Related Skills
product-frameworks— Full PM toolkit (value prop, market sizing, competitive analysis, user research, business case)write-prd— Convert prioritized features into product requirements documentsproduct-analytics— Define and instrument the metrics that feed RICE reach/impact scoresokr-design— Set the objectives that determine which KPIs drive RICE impact scoringmarket-sizing— TAM/SAM/SOM analysis that informs strategic prioritycompetitive-analysis— Competitor context that raises or lowers WSJF time criticality scores
---
Version: 1.0.0
RICE Scoring Guide
Comprehensive guide for using RICE prioritization effectively.
RICE Formula
RICE Score = (Reach × Impact × Confidence) / EffortReach Scoring
Estimate how many users/customers will be affected per quarter.
| Score | % of Users | Description |
|---|---|---|
| 10 | 100% | All users |
| 8 | 80% | Most users |
| 5 | 50% | Half of users |
| 3 | 30% | Some users |
| 1 | 10% | Few users |
Calculating Reach
Reach = (Users affected) / (Total users) × 10
Example:
- Total MAU: 10,000
- Users who use search: 8,000
- Reach for search improvement: 8,000/10,000 × 10 = 8Impact Scoring
How much will this move the needle on your goal?
| Score | Impact Level | Description |
|---|---|---|
| 3.0 | Massive | 3x or more improvement |
| 2.0 | High | 2x improvement |
| 1.0 | Medium | Notable improvement |
| 0.5 | Low | Minor improvement |
| 0.25 | Minimal | Barely noticeable |
Impact Assessment Questions
1. What metric does this affect? 2. By how much will it change? 3. What's the baseline? 4. What's the target?
Confidence Scoring
How certain are you about Reach and Impact estimates?
| Score | Confidence | Evidence Level |
|---|---|---|
| 1.0 | High | Data-backed (analytics, A/B tests) |
| 0.8 | Medium | Some validation (user interviews, surveys) |
| 0.5 | Low | Gut feel (experienced intuition) |
| 0.3 | Moonshot | Speculative (new territory) |
Confidence Calibration
- Used similar feature before? → +0.2
- Have user research? → +0.2
- Have analytics data? → +0.2
- New domain/technology? → -0.2
- Many unknowns? → -0.2
Effort Scoring
Person-weeks of work to ship (design, development, testing).
| Score | Effort | Timeline |
|---|---|---|
| 0.5 | Trivial | < 1 week |
| 1 | Small | 1 week |
| 2 | Medium | 2 weeks |
| 4 | Large | 1 month |
| 8 | XL | 2 months |
| 16 | XXL | Quarter |
Effort Estimation Tips
- Include all disciplines (design, eng, QA)
- Add buffer for unknowns (1.2-1.5x)
- Consider dependencies
- Account for coordination overhead
Example Scoring
## Feature: Advanced Search Filters
### Reach: 8
- 80% of users use search at least once/week
- Source: Analytics dashboard
### Impact: 2.0
- Support tickets about search: 40/week
- Expected reduction: 50%
- Secondary: +10% search completion rate
### Confidence: 0.8
- Have user interview data (5 users)
- Similar feature at competitor successful
- No A/B test yet
### Effort: 2
- Design: 0.5 weeks
- Backend: 1 week
- Frontend: 0.5 weeks
### RICE Score
(8 × 2.0 × 0.8) / 2 = 6.4Common Mistakes
| Mistake | Solution |
|---|---|
| Overestimating reach | Use actual data, not hopes |
| Impact without baseline | Define current state first |
| 100% confidence | Nothing is certain |
| Underestimating effort | Include all work, add buffer |
| Comparing across goals | Only compare within same goal |
When NOT to Use RICE
- Mandatory compliance/security work
- Technical debt paydown
- Infrastructure investments
- Strategic bets with long payoff
WSJF (Weighted Shortest Job First) Guide
Framework for prioritizing when time-to-market matters.
WSJF Formula
WSJF = Cost of Delay / Job SizeHigher WSJF = Higher priority (do first)
Cost of Delay Components
Cost of Delay = User Value + Time Criticality + Risk ReductionUser Value (1-10)
How much do users need this?
| Score | Description |
|---|---|
| 10 | Critical - users leaving without it |
| 7-9 | High - major pain point |
| 4-6 | Medium - nice improvement |
| 1-3 | Low - minor enhancement |
Time Criticality (1-10)
How urgent is the timing?
| Score | Description |
|---|---|
| 10 | Hard deadline (regulatory, event) |
| 7-9 | Competitive window closing |
| 4-6 | Sooner better, but flexible |
| 1-3 | No time pressure |
Risk Reduction (1-10)
Does delay increase risk?
| Score | Description |
|---|---|
| 10 | Major risk if delayed (security, stability) |
| 7-9 | Significant risk accumulation |
| 4-6 | Moderate risk growth |
| 1-3 | Risk doesn't change with time |
Job Size (1-10)
Relative size compared to other work.
| Score | Description |
|---|---|
| 1-2 | XS - days |
| 3-4 | S - 1-2 weeks |
| 5-6 | M - 2-4 weeks |
| 7-8 | L - 1-2 months |
| 9-10 | XL - quarter+ |
Example Calculation
## Feature: Security Patch for CVE
### User Value: 6
- Affects enterprise customers
- Not user-facing but required for compliance
### Time Criticality: 9
- CVE published, 90-day disclosure window
- Competitors already patched
### Risk Reduction: 10
- Active exploitation in the wild
- Potential data breach
### Cost of Delay: 6 + 9 + 10 = 25
### Job Size: 3
- Known fix, straightforward implementation
- ~1 week of work
### WSJF: 25 / 3 = 8.33When to Use WSJF
- Multiple time-sensitive items competing
- Opportunity windows exist
- Dependencies create bottlenecks
- Need to justify "why now"
WSJF vs RICE
| Use WSJF When | Use RICE When |
|---|---|
| Time matters | Value matters |
| Deadlines exist | Steady-state prioritization |
| Dependencies complex | Independent features |
| Opportunity cost high | User reach important |
Visualization
HIGH Time Criticality
│
┌──────────┼──────────┐
│ DO │ DO │
│ FIRST │ SECOND │
HIGH ──────┼──────────┼──────────┼────── LOW
User Value │ DO │ DO │ User Value
│ THIRD │ LAST │
└──────────┼──────────┘
│
LOW Time CriticalityRule Categories
1. RICE & ICE Scoring (prioritize) — HIGH — 1 rule
RICE scoring with reach, impact, confidence, effort scales. ICE quick scoring variant.
prioritize-rice.md— Quantitative feature scoring with calibration guidance
2. WSJF & MoSCoW (prioritize) — HIGH — 1 rule
WSJF cost of delay formula, time criticality, MoSCoW scope negotiation.
prioritize-wsjf.md— SAFe-aligned prioritization and scope categorization
3. Opportunity Cost (prioritize) — HIGH — 1 rule
Value-effort matrix, cost of delay analysis, trade-off flagging.
prioritize-opportunity-cost.md— Opportunity cost quantification and trade-off frameworks
Opportunity Cost & Trade-Off Analysis
Patterns for making prioritization decisions that account for what you give up, not just what you gain. Complements RICE and WSJF scoring with opportunity cost reasoning.
Value-Effort Matrix
A 2x2 matrix for rapid feature sequencing based on expected value and required effort.
HIGH VALUE
|
Do Next | Do First
(High value, | (High value,
high effort) | low effort)
|
-----------------+-----------------
|
Consider | Quick Win
(Low value, | (Low value,
high effort) | low effort)
|
LOW VALUE
HIGH EFFORT LOW EFFORT| Quadrant | Action | Example |
|---|---|---|
| Do First | Ship immediately -- high ROI | Fix broken onboarding step |
| Quick Win | Batch into next sprint | Add CSV export button |
| Do Next | Plan and resource properly | Platform migration |
| Consider | Challenge whether to do at all | Redesign rarely-used admin page |
Scoring for Placement
- Value (1-10): Combine user impact, strategic alignment, revenue potential
- Effort (1-10): Engineering weeks, cross-team coordination, risk
- Threshold: Value >= 6 is "high value", Effort >= 6 is "high effort"
Cost of Delay Analysis
Quantify what it costs to NOT do something each time period it is delayed.
## Cost of Delay: [Feature Name]
### Revenue Impact
- Lost revenue per month of delay: $X
- Source: [Pipeline data, churn analysis, competitive loss]
### User Impact
- Users affected: N
- Workaround cost per user per month: X hours
### Strategic Impact
- Competitive window closes in: N months
- Regulatory deadline: [date or N/A]
### Total Cost of Delay
$X/month (quantified) + [qualitative strategic cost]Delay Cost Categories
| Type | How to Estimate | Example |
|---|---|---|
| Revenue delay | Pipeline deals blocked by missing feature | $50K/month in stalled deals |
| Churn risk | Customers citing this in exit surveys | 3 enterprise accounts at risk |
| Competitive | Competitor ships first, window shrinks | Market share loss |
| Compliance | Fines or market access loss after deadline | GDPR: $20M max fine |
| Compounding | Delay makes future work harder | Tech debt interest |
Trade-Off Flagging Template
When two options compete for the same resources, surface the trade-off explicitly for human decision-makers. Do not make the call -- present the data.
## Trade-Off: [Decision Title]
### Context
[Why this trade-off exists -- shared resources, timeline conflict, etc.]
### Option A: [Name]
- **Pros:** [List 2-3 concrete benefits with data]
- **Cons:** [List 2-3 concrete downsides with data]
- **RICE Score:** [If available]
- **Cost of Delay:** [$/month]
### Option B: [Name]
- **Pros:** [List 2-3 concrete benefits with data]
- **Cons:** [List 2-3 concrete downsides with data]
- **RICE Score:** [If available]
- **Cost of Delay:** [$/month]
### Recommendation
Human decides. Key factors to weigh:
1. [Factor 1 -- e.g., Q2 OKR alignment]
2. [Factor 2 -- e.g., team capacity next sprint]
3. [Factor 3 -- e.g., customer commitment]Sequencing Principles
When features have dependencies or shared resources, use these sequencing rules:
1. Highest cost-of-delay first -- unless blocked by dependencies 2. Unblock others early -- a low-value enabler that unblocks 3 high-value items ships first 3. Reduce risk early -- unknowns first, known work later (fail fast) 4. Batch small items -- group Quick Wins into a single sprint to clear the backlog
Incorrect -- prioritizing by gut feel:
Priority list:
1. AI search (CEO wants it)
2. Dashboard redesign (designer is excited)
3. CSV import (seems easy)Correct -- opportunity cost matrix with explicit trade-offs:
Priority list (by cost of delay):
1. CSV import -- $30K/month blocked deals, 1 week effort (Do First)
2. AI search -- $25K/month competitive risk, 6 week effort (Do Next)
3. Dashboard redesign -- $0 cost of delay, nice-to-have (Consider)
Trade-off flagged: AI search vs platform migration for same
eng team in Q2. See trade-off analysis doc for decision.RICE & ICE Prioritization
RICE Framework
Developed by Intercom for data-driven feature comparison.
Formula
RICE Score = (Reach x Impact x Confidence) / EffortFactors
| Factor | Definition | Scale |
|---|---|---|
| Reach | Users/customers affected per quarter | Actual number or 1-10 normalized |
| Impact | Effect on individual user | 0.25 (minimal) to 3 (massive) |
| Confidence | How sure are you? | 0.5 (low) to 1.0 (high) |
| Effort | Person-months required | Actual estimate |
Impact Scale
| Score | Level | Description |
|---|---|---|
| 3 | Massive | Fundamental improvement |
| 2 | High | Significant improvement |
| 1 | Medium | Noticeable improvement |
| 0.5 | Low | Minor improvement |
| 0.25 | Minimal | Barely noticeable |
Confidence Scale
| Score | Level | Evidence |
|---|---|---|
| 1.0 | High | Strong data, validated |
| 0.8 | Medium | Some data, reasonable assumptions |
| 0.5 | Low | Gut feeling, little data |
| 0.3 | Moonshot | Speculative, new territory |
Example Calculation
Feature: Smart search with AI suggestions
Reach: 50,000 users/quarter (active searchers)
Impact: 2 (high - significantly better results)
Confidence: 0.8 (tested in prototype)
Effort: 3 person-months
RICE = (50,000 x 2 x 0.8) / 3 = 26,667RICE Scoring Template
| Feature | Reach | Impact | Confidence | Effort | RICE Score |
|---|---|---|---|---|---|
| Feature A | 10,000 | 2 | 0.8 | 2 | 8,000 |
| Feature B | 50,000 | 1 | 1.0 | 4 | 12,500 |
| Feature C | 5,000 | 3 | 0.5 | 1 | 7,500 |
ICE Framework
Simpler than RICE, ideal for fast prioritization.
ICE Score = Impact x Confidence x EaseAll factors on 1-10 scale.
ICE vs RICE
| Aspect | RICE | ICE |
|---|---|---|
| Complexity | More detailed | Simpler |
| Reach consideration | Explicit | Implicit in Impact |
| Effort | Person-months | 1-10 Ease scale |
| Best for | Data-driven teams | Fast decisions |
Kano Model
Categorize features by customer satisfaction impact.
| Type | Absent | Present | Example |
|---|---|---|---|
| Must-Be | Dissatisfied | Neutral | Login works |
| Performance | Dissatisfied | Satisfied | Fast load times |
| Delighters | Neutral | Delighted | AI suggestions |
| Indifferent | Neutral | Neutral | About page design |
| Reverse | Satisfied | Dissatisfied | Forced tutorials |
Framework Selection Guide
| Situation | Recommended Framework |
|---|---|
| Data-driven team with metrics | RICE |
| Fast startup decisions | ICE |
| SAFe/Agile enterprise | WSJF |
| Fixed scope negotiation | MoSCoW |
| Customer satisfaction focus | Kano |
Common Pitfalls
| Pitfall | Mitigation |
|---|---|
| Gaming the scores | Calibrate as a team regularly |
| Ignoring qualitative factors | Use frameworks as input, not gospel |
| Analysis paralysis | Set time limits on scoring sessions |
| Inconsistent scales | Document and share scoring guidelines |
Incorrect — RICE without documented assumptions:
Feature A: RICE = 8,000
Feature B: RICE = 12,500
Priority: B, then ACorrect — RICE with transparent scoring:
Feature B: Smart search with AI
- Reach: 50,000 users/quarter (active searchers)
- Impact: 2 (high - significantly better results)
- Confidence: 0.8 (tested in prototype)
- Effort: 3 person-months
RICE = (50,000 × 2 × 0.8) / 3 = 26,667WSJF & MoSCoW Prioritization
WSJF (Weighted Shortest Job First)
SAFe framework optimizing for economic value delivery.
Formula
WSJF = Cost of Delay / Job SizeHigher WSJF = Higher priority (do first)
Cost of Delay Components
Cost of Delay = User Value + Time Criticality + Risk Reduction| Component | Question | Scale |
|---|---|---|
| User Value | How much do users/business want this? | 1-21 (Fibonacci) |
| Time Criticality | Does value decay over time? | 1-21 |
| Risk Reduction | Does this reduce risk or enable opportunities? | 1-21 |
| Job Size | Relative effort compared to other items | 1-21 |
Time Criticality Guidelines
| Score | Situation |
|---|---|
| 21 | Must ship this quarter or lose the opportunity |
| 13 | Competitor pressure, 6-month window |
| 8 | Customer requested, flexible timeline |
| 3 | Nice to have, no deadline |
| 1 | Can wait indefinitely |
Example
Feature: GDPR compliance update
User Value: 8 (required for EU customers)
Time Criticality: 21 (regulatory deadline)
Risk Reduction: 13 (avoids fines)
Job Size: 8 (medium complexity)
Cost of Delay = 8 + 21 + 13 = 42
WSJF = 42 / 8 = 5.25WSJF vs RICE
| Use WSJF When | Use RICE When |
|---|---|
| Time matters | Value matters |
| Deadlines exist | Steady-state prioritization |
| Dependencies complex | Independent features |
| Opportunity cost high | User reach important |
MoSCoW Method
Qualitative prioritization for scope management.
Categories
| Priority | Meaning | Guideline |
|---|---|---|
| Must Have | Non-negotiable for release | ~60% of effort |
| Should Have | Important but not critical | ~20% of effort |
| Could Have | Nice to have if time permits | ~20% of effort |
| Won't Have | Explicitly out of scope | Documented |
Application Rules
1. Must Have items alone should deliver a viable product 2. Should Have items make product competitive 3. Could Have items delight users 4. Won't Have prevents scope creep
Template
## Release 1.0 MoSCoW
### Must Have (M)
- [ ] User authentication
- [ ] Core data model
- [ ] Basic CRUD operations
### Should Have (S)
- [ ] Search functionality
- [ ] Export to CSV
- [ ] Email notifications
### Could Have (C)
- [ ] Dark mode
- [ ] Keyboard shortcuts
- [ ] Custom themes
### Won't Have (W)
- Mobile app (Release 2.0)
- AI recommendations (Release 2.0)
- Multi-language support (Release 3.0)Practical Tips
1. Calibrate together: Score several items as a team to align understanding 2. Revisit regularly: Priorities shift -- rescore quarterly 3. Document assumptions: Why did you give that Impact score? 4. Combine frameworks: Use ICE for quick triage, RICE for final decisions
Incorrect — MoSCoW without viable Must-Have set:
Must Have:
- User auth, CRUD, search, export, AI features,
mobile app, analytics, notifications (90% of scope)
[Product not viable with just Must-Have items]Correct — Must-Have delivers viable product:
Must Have (60% of effort):
- User authentication
- Core data model
- Basic CRUD operations
Should Have (20%):
- Search, export, notifications
Could Have (20%):
- Dark mode, keyboard shortcuts{
"skill": "prioritization",
"version": "1.0.0",
"testCases": [
{
"id": "prioritize-opportunity-cost",
"rule": "prioritize-opportunity-cost",
"query": "We have limited engineering capacity and need to choose between three major features. How do I evaluate the trade-offs?",
"expectedBehavior": [
"Uses value-effort matrix to plot features by expected value and required effort",
"Applies cost of delay analysis to quantify what is lost by deferring each feature",
"Flags trade-offs explicitly for human decision-makers rather than making the choice automatically",
"Considers both direct value and opportunity cost of not pursuing alternative features"
]
},
{
"id": "prioritize-rice",
"rule": "prioritize-rice",
"query": "Score these backlog items using RICE: search redesign, dark mode, API versioning, mobile app",
"expectedBehavior": [
"Scores each item with Reach, Impact (0.25 to 3 scale), Confidence, and Effort factors",
"Calculates RICE score as Reach times Impact times Confidence divided by Effort",
"Ranks features by calculated RICE score from highest to lowest priority",
"Documents scoring rationale with justification for each factor value assignment"
]
},
{
"id": "prioritize-wsjf",
"rule": "prioritize-wsjf",
"query": "We have a regulatory compliance deadline. How do I prioritize backlog items using WSJF?",
"expectedBehavior": [
"Calculates Cost of Delay from User Value plus Time Criticality plus Risk Reduction",
"Divides Cost of Delay by Job Size to produce the WSJF priority score",
"Identifies regulatory deadline items as high time criticality for elevated priority",
"Includes MoSCoW categorization to distinguish must-have from should-have and nice-to-have"
]
}
]
}