
Qa Quarto
- 44 installs
- 1.4k repo stars
- Updated June 10, 2026
- pedrohcgs/claude-code-my-workflow
Helps with ai & agent building tasks.
About
qa-quarto is a Claude Code skill for ai & agent building. It helps solo builders move faster with AI-assisted development.
- qa-quarto
- AI & Agent Building
- AI-coding skill
Qa Quarto by the numbers
- 44 all-time installs (skills.sh)
- +5 installs in the week ending Aug 4, 2026 (Skillselion tracking)
- Ranked #7,794 of 16,546 AI & Agent Building skills by installs in the Skillselion catalog
- Data as of Aug 5, 2026 (Skillselion catalog sync)
npx skills add https://github.com/pedrohcgs/claude-code-my-workflow --skill qa-quartoAdd your badge
Show developers this skill is listed on Skillselion. Paste this into your README.
| Installs | 44 |
|---|---|
| repo stars | ★ 1.4k |
| Last updated | June 10, 2026 |
| Repository | pedrohcgs/claude-code-my-workflow ↗ |
What it does
Helps with ai & agent building tasks.
Files
Adversarial Quarto vs Beamer QA Workflow
Compare Quarto HTML slides against their Beamer PDF benchmark using an iterative critic/fixer loop.
Philosophy: The Beamer PDF is the gold standard. The Quarto translation must be at least as good in every dimension.
---
Workflow
Phase 0: Pre-flight → Phase 1: Critic audit → Phase 2: Fixer → Phase 3: Re-audit → Loop until APPROVED (max 5 rounds)Hard Gates (Non-Negotiable)
| Gate | Condition |
|---|---|
| Overflow | NO content cut off |
| Plot Quality | Interactive charts >= static plots |
| Content Parity | No missing slides/equations/text |
| Visual Regression | Quarto >= Beamer in all dimensions |
| Slide Centering | Content centered, no jumping |
| Notation Fidelity | All math verbatim from Beamer |
Phase 0: Pre-flight
1. Locate Beamer (.tex/.pdf) and Quarto (.qmd/.html) files 2. Check freshness (re-render if QMD newer than HTML) 3. Verify TikZ SVGs if applicable
Phase 1: Initial Audit
Launch the quarto-critic agent to compare Beamer vs Quarto comprehensively. Report saved to quality_reports/[Lecture]_qa_critic_round1.md.
Phase 2: Fix Cycle
If not APPROVED, launch quarto-fixer agent to apply fixes (Critical → Major → Minor), re-render, and verify.
Phase 3: Re-Audit
Re-launch critic to verify fixes. Loop back to Phase 2 if needed.
Iteration Limits — loop-until-dry
This is the loop-until-dry primitive from `orchestrator-protocol.md`: the critic returns FINDINGs (the hard-gate table is the CRITICAL roll-up, per `orchestration-schemas.md`); the loop converges when a round adds 0 new CRITICAL/MAJOR findings (deduped on location+finding), not at a fixed round count.
- Fallback cap: 5 rounds bounds a non-converging loop, then escalate to the user with remaining issues.
- Two-strikes: the same gate failing in rounds N and N+2 is flagged for the user, not patched again (`summary-parity.md`).
- APPROVED iff every hard gate passes (zero CRITICAL).
Final Report
Save to quality_reports/[Lecture]_qa_final.md with hard gate status, iteration summary, and remaining issues.